The Arbour Walthamstow
London
Project Value: £2M
Current Workstage: @RIBA 6
Air Permeability Achieved: 0.3m3/m2/hr@50Pa
Optimised building fabric advice for a highly progressive terrace of new build homes in East London; no fossil fuel products, all materials on sit to be reused, super low embodied carbon; Airtightness and thermal bridging analysis. Near Passivhaus energy performance.
Awarded a RIBA National Award
Listing of the week in the Modern House